Skip navigation.
Home

2:30 Ironman 70.3 Mont Tremblant

Based on a Best Bike Split generated plan for a simulated 2h30min Mont Tremblant 70.3. Meant for use with a KICKR.

Added a 10min warm up and a 5min cool down.

Data used to build the Best Bike Split model was recorded from my Garmin during the 2014 70.3 at Mont Tremblant.

Total Time: 02:44:21
Category: Muscular endurance
Author: sckor